Memorex LOCK - VERSION 2-24 Especificaciones Pagina 55

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 489
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 54
BIM-EPIC Job Control Tape Processing
Chapter 1. Introduction 1-41
It passes final control to VSE.
In close processing for tape, BIM-EPIC gains control from and passes control to VSE more
than once.
BIM-EPIC tells VSE how to position the tape, whether to unload it, rewind it, or leave it in
place.
It releases the drive’s assignments and detaches the drive from the VSE machine is Autoattach
is active.
On output, it writes to the DSN Catalog, placing all volumes in closed status.
BIM-EPIC passes final control to VSE.
Closing Tape
Datasets
Vista de pagina 54
1 2 ... 50 51 52 53 54 55 56 57 58 59 60 ... 488 489

Comentarios a estos manuales

Sin comentarios