Memorex LOCK - VERSION 2-24 Especificaciones Pagina 18

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 359
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 17
Pre-4.1 Upgrade Checklist
1-4 BIM-EPIC Installation and System Guide
Pre-4.1 Upgrade Checklist
This is a list of the steps necessary to upgrade from a pre-4.1 version of BIM-EPIC. Use this
checklist to certify performance of each step.
__ 1. Contact BIM-EPIC Technical Support for Upgrades
__ 2. Complete Pre-Installation Worksheet
__ 3.
Meet Operating System Requirements
__ 4. Meet Space Requirements
__ 5.
Meet Software Compatibility Requirements
__ 6. Ensure BIM-GSS Availability
__ 7.
If Automatic Cartridge Library (ACL) support is used, determine the identifying
information used in the vendor’s ACL unit. This information is specific to each
ACL vendor.
__ 1. Load Library Modules from Distribution Tape
__ 2.
Reassemble TSIDPOL Phase
__ 3. Reassemble TSIVDEF Phase
__ 4.
Create the Separate JOBQ File (optional)
__ 5.
Create BIM-EPIC Resource Dataset (required to share tape resources among
multiple physical or virtual VSE machines)
__ 1.
Update SVA Size
__ 2.
Increase System GETVIS
__ 3.
Increase Partition GETVIS
__ 4.
Increase Dynamic Space GETVIS
__ 5.
Update LIBDEF Procedures
__ 6.
Activate BIM-EPIC
__ 7.
Finish CICS Installation
Description
Pre-Installation
Modifications
Installation of
Major Datasets
Update Your ASI
Procedure
Vista de pagina 17
1 2 ... 13 14 15 16 17 18 19 20 21 22 23 ... 358 359

Comentarios a estos manuales

Sin comentarios