Memorex LOCK - VERSION 2-24 Especificaciones Pagina 37

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 359
  • Tabla de contenidos
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 36
Preparing for First-Time Installation Additional Software Considerations
Chapter 2. Installing the Basic System 2-9
Additional Software Considerations
BIM-ALERT: BIM-EPIC’s special option EPS029 is required to run with ALERT.
BIM-FAQS/ASO and BIM-FAQS/PCS: Must be started before starting BIM-EPIC.
GSMTA: For Multiple Transient Area (GSMTA) users, update GSMTA’s enqueue table by
adding the following parameter to the GSMTA start-up:
$$BTSID,NQID=(VTOC)
CA-LIBRARIAN: Inhibit BIM-EPIC’s LUB allocation for all controlled datasets used with
CA-LIBRARIAN programs.
CA-SORT:
Set the CA-SORT options DYNAM/D and DYNAM/FI to NO. If these options are not
deactivated, INVALID DTF TYPE messages can occur.
Specify the CA-SORT macro parameter SPECIAL=2 if BIM-EPIC controlled tapes are
to be accessed by CA-SORT.
If the BIM-EPIC sort interface program (TSIDSRT) is executed instead of CA-SORT,
and if the CA-SORT RC option is set to NO or is unspecified, set the CA-SORT option
INVCNCL to YES. INVCNCL=YES causes CA-SORT to cancel the job when a
critical sort error occurs, just as if CA-SORT was executed directly.
We recommend that you set the BIM-EPIC special options EPS002 and EPS003 to
YES. These options permit LUB allocation for SORTIN, SORTOUT, and SORTWK
files, thus preventing any potential SYS number conflict which might occur during
secondary extent allocations.
CA-Easytrieve: Define EASYTRIEVE’s CRDWK dataset to BIM-EPIC’s DSN Catalog as a
non-generation dataset, and inhibit truncation on the dataset.
CA-PANVALET: Inhibit BIM-EPIC’s LUB allocation for all controlled datasets used with
PANVALET programs.
Deactivate BIM-EPIC in the entire VSE system when applying any VSE maintenance that
recatalogs or reloads any BIM-EPIC-required phases in the SVA. See 5-44 in this manual for
more information.
POWER: Start BIM-EPIC before POWER.
BIM-EPIC is compatible with Library Management Software (LMS) releases 2.7 and above
for ACL support.
Other BIM Software
COMPUTER
ASSOCIATES
IBM
MEMOREX
Vista de pagina 36
1 2 ... 32 33 34 35 36 37 38 39 40 41 42 ... 358 359

Comentarios a estos manuales

Sin comentarios